Showing posts with label incentives. Show all posts
Showing posts with label incentives. Show all posts

Tuesday, July 27, 2010

Nissan Announces Roll-Out Plan for Zero-Emission Nissan LEAF at the Plug-in 2010 Conference in San Jose

At the Plug-in 2010 Conference in San Jose, CA today, North America's Nissan  xecutive vice president, Carlos Tavares, announced that the Leaf's battery pack will be covered by an eight-year/100,000-mile warranty similar to that of what Chevrolet is offering on the Volt pack. He said that feedback from people interested in the Leaf was important in setting these levels, so that explains why Leaf hand-raisers received email surveys about the topic recently.

Nissan has also announced its official rollout plans. Nissan LEAF will first launch in December, in California, Washington, Oregon, Arizona and Tennessee. Firm orders from these five states, which make up the so-called EV Project, will begin in August.

Following that initial wave, the machine will be sent to Texas and Hawaii in January 2011. Next up will be North Carolina, Florida, Georgia, Washington DC, Virginia, Maryland, South Carolina and Alabama in April 2011. The rest of the nation will see their Leafs beginning in the fall of 2011 with availability in all markets nationwide by the end of that year.

Src : Nissan Press Release Via autoblog

PRESS RELEASE

Nissan Announces National Market Roll-Out Plan for Zero-Emission Nissan LEAF

- More than half of 17,000 reservations located in initial launch markets -

SAN JOSE, Calif., July 27 /PRNewswire-FirstCall/ -- Today, nearly 17,000 future Nissan LEAF drivers are learning when the world's first affordable all-electric, zero-emission vehicle will be available in their markets. Consumers who have placed reservations for the Nissan LEAF received a communication today regarding market timing and next steps in ordering the all-electric vehicle.

Nissan LEAF first will be available to consumers in December, in California, Washington, Oregon, Arizona and Tennessee. These areas are home to The EV Project – the largest electric vehicle and infrastructure deployment ever undertaken. The EV Project is a result of a partnership with charging infrastructure provider ECOtality and partially funded by a grant from the U.S. Dept. of Energy. Customers in these first five launch states, who represent more than 55 percent of total Nissan LEAF reservations, will be able to place firm orders for the Nissan LEAF starting in August.

Nissan LEAF will be introduced to Texas and Hawaii shortly thereafter, in January 2011; North Carolina, Florida, Georgia, Washington DC, Virginia, Maryland, South Carolina and Alabama follow in April 2011; and be rolled-out to the balance of the nation beginning in Fall 2011 with availability in all markets nationwide by the end of that year.

"We are pleased to see so many people making a choice for a zero-emission future by placing reservations for the Nissan LEAF," said Brian Carolin, senior vice president, Sales and Marketing, Nissan North America. "Consumer feedback and market readiness have been key drivers in developing our phased rollout. Nissan is able to target areas of customer demand for early launch, while continuing to work in future markets to ensure the continued success of electric vehicles."

Nissan North America also is informing its consumers that the lithium-ion battery pack that powers the Nissan LEAF will carry a warranty of 8 years or 100,000 miles – matching U.S. market competitive conditions.

Consumers who have reserved the Nissan LEAF online will be invited to place orders through their dealer for the vehicle in advance of market roll-out timing, allowing time for consumers to select a dealer and assess home charging needs. Nissan is continuing to take reservations for the Nissan LEAF through its website, www.NissanUSA.com. Interested consumers are encouraged to place a reservation, which entails a $99 fully refundable fee to secure a spot on the list to place an order.

The reservations process has educated Nissan about more than just geographic distribution. Some information we've learned about future Nissan LEAF drivers includes:

  • Favorite color: The favorite color of Nissan LEAF owners is blue. More than 30 percent of reservations are for blue Nissan LEAF electric cars. Silver is a close second, at about 26 percent. The remaining reservations are close to evenly split among red, black and white.
  • Trim level: About 75 percent of Nissan LEAF orders are for the SL trim level, which adds a rearview monitor, solar panel spoiler, fog lights, and automatic headlights.
  • Home and Parking: About 75 percent of people who placed reservations own a single-family home. About 68 percent have attached garages, while an additional 18 percent have detached garages or carports. Home ownership and dedicated parking are important factors for Nissan LEAF drivers who plan to charge their vehicles at home.
  • Purchase time: About 67 percent of Nissan LEAF reservations holders have indicated that they'd be ready to purchase or lease a Nissan LEAF within one year of placing the reservation. An additional 24 percent indicated they would be ready in one to two years.
  • Interests: Several primary interests are inspiring people to order a Nissan LEAF. Cited interests include energy independence (35 percent); environmental consciousness (34 percent); and cost/fuel economy (20 percent).

In North America, Nissan's operations include automotive design, engineering, consumer and corporate financing, sales and marketing, distribution and manufacturing. Nissan is dedicated to improving the environment under the Nissan Green Program 2010, whose key priorities are reducing CO2 emissions, cutting other emissions and increasing recycling. More information on the Nissan LEAF and zero emissions can be found at www.nissanusa.com.

Thursday, June 17, 2010

Chevrolet Volt owners could get free home charging stations but only for the first 4400 owners.


U.S. Department of Energy will help out by providing free 240-volt home chargers for 4,400 early buyers.

The chargers are made either by ECOtality (which will install 2,600 Volt chargers) or Coulomb Technologies (1,800 chargers). In all, the DOE is helping to fit around 15,000 plug-in vehicle chargers across America. Of course, 'free' might be a relative term here. That's what the headline says, but Tony DiSalle, product and marketing director for the Chevrolet Volt, said in a statement that,

"For Volt owners who want to install a faster 240-volt charge station, we expect the Department of Energy project to save $1,000 and $2,000."

These chargers might cost around $2,000.


PRESS RELEASE

4,400 Chevrolet Volt Owners to be Eligible for Free Home Charging Stations

2010-06-17

* When the Volt goes on sale later this year, buyers will be eligible for a 240-volt charge station, and home installation in some cases
* Part of Department of Energy project to install approximately 15,000 240-volt home charge stations across the U.S.
* Data collected from the charge stations will be analyzed by the Department of Energy to understand what is required for widespread electric vehicle use

DETROIT – The first buyers of the Chevrolet Volt electric vehicle with extended-range capability will be eligible for one of 4,400 free home charging stations. The program will provide Volt owners with a 240-volt charge station from either ECOtality, Inc. or Coulomb Technologies. In many cases, it will include the cost of home installation. The projects are made possible with a grant of American Recovery and Reinvestment Act funds from the Transportation Electrification Initiative administered by the U.S. Department of Energy (DOE).

"Many owners will plug their Volt into a normal 120-volt electrical outlet, charge overnight and drive to work in the morning using only battery power," said Tony DiSalle, Product and Marketing Director for the Chevrolet Volt. "For Volt owners who want to install a faster 240-volt charge station, we expect the Department of Energy project to save $1,000 and $2,000."

The U.S. Department of Energy projects were established with two objectives: installing charging stations in residential, workplace and public areas to encourage consumers to purchase electric vehicles; and studying electric vehicle usage to optimize future electric vehicle charging infrastructure.

To encourage consumer purchases of electric vehicles, federal grants and other funds have been awarded to install more than 15,000 home charge stations. That total includes 4,400 home charge stations for Volt owners; 2,600 as part of The EV Project from ECOtality, and 1,800 as part of the ChargePoint America project from Coulomb Technologies.

To study electric vehicle usage, the programs will collect data such as average charge time, energy usage and the starting and ending time of the charging process. This data will be analyzed by the U.S. Department of Energy to understand how electric vehicles are driven, how and when they are charged, and ultimately what is required for widespread adoption of electric vehicles.

"In addition to saving money, these projects offer Volt owners an opportunity to play a role in developing our collective understating of electric vehicles in the market," DiSalle said.

At the time of purchase, Volt buyers will receive a portable 120-volt charge cord, and will have the option of installing a 240-volt charge station available from Chevrolet. Volt buyers that live within the program cities may apply for a free 240-volt home charging station through the Coulomb or ECOtality programs if they are willing to share their charging information. Additional consumer information on eligibility requirements and the application process will be available when the Volt goes on sale later this year.

The Chevrolet Volt is an electric vehicle with extended range capability, designed to drive up to 350 miles without stopping to recharge or refuel. For the first 40 miles, Volt is powered by pure electricity, without using gasoline or producing tailpipe emissions. When the Volt's lithium-ion battery is depleted, a gasoline-powered engine/generator seamlessly operates to extend the driving range another 300 miles.

# # #

About Chevrolet

Chevrolet is a global automotive brand, with annual sales of about 3.5 million vehicles in more than 130 countries. Chevrolet provides consumers with fuel-efficient, safe and reliable vehicles that deliver high quality, expressive design, spirited performance and value. In the U.S., the Chevrolet portfolio includes: iconic performance cars, such as Corvette and Camaro; dependable, long lasting pickups and SUVs, such as Silverado and Suburban; and award-winning passenger cars and crossovers, such as Malibu, Equinox and Traverse. Chevrolet also offers "gas-friendly" solutions, such as the upcoming 2011 Chevrolet Cruze Eco model that is expected to deliver up to an estimated 40 mpg highway, and 2011 Chevrolet Volt that will offer up to 40 miles of electric driving and an additional 300 miles of extended range with the onboard generator (based on GM testing). Most new Chevrolet models offer OnStar safety, security, and convenience technologies including OnStar Hands-Free Calling, Automatic Crash Response, and Stolen Vehicle Slowdown. More information regarding Chevrolet models, fuel solutions, and OnStar availability can be found at www.chevrolet.com.

About ECOtality, Inc.

ECOtality, Inc. (NASDAQ:ECTY), headquartered in Tempe, Arizona, is a leader in clean electric transportation and storage technologies. Through innovation, acquisitions, and strategic partnerships, ECOtality accelerates the market applicability of advanced electric technologies to replace carbon-based fuels. For more information about ECOtality, Inc., please visit www.ecotality.com. For more information about The EV Project, the world's largest electriv vehicle infrastructure deployment program, please visit www.theevproject.com.

About Coulomb Technologies, Inc.

Coulomb Technologies is the leader in electric vehicle charging station infrastructure with networked charging stations installed in municipalities and organizations worldwide. Coulomb provides a vehicle-charging infrastructure, with an open system driver network: the ChargePoint Network (www.mychargepoint.net) provides multiple web-based portals for Hosts, Fleet managers, Drivers, and Utilities, and ChargePoint Networked Charging Stations ranging in capability from 120 Volt to 240 Volt AC charging and up to 500 Volt DC charging. For more information, follow Coulomb on Twitter at twitter.com/coulombevi. To request a charging station in your area, visit http://www.mychargepoint.net/request-station.php. To download the ChargePoint iPhone App, click here.

[Source: General Motors]
Related Posts Plugin for WordPress, Blogger...